How LightLoop works
A managed decision system for lighting assets.
LightLoop replaces habit with evidence — so every lighting decision, across every site, regardless of contractor, follows an agreed, auditable rule set.
Core principle
Separate the decision from the delivery — and document both.
The six-step loop
One continuous cycle — not a one-off project.
- 01
Audit
Assess every fitting: condition, performance, age, compliance, value.
- 02
Decide
Identify the right outcome: replace, remanufacture, repair or retain.
- 03
Remanufacture
Retain the housing, renew performance with new LED technology.
- 04
Reinstall
To the highest standards, extending life and restoring performance.
- 05
Track
Performance, energy, savings and compliance across the estate.
- 06
Reassess
Review as assets age and conditions change — closing the loop.
Step 6 feeds Step 1. The loop closes — and the next decision starts with better evidence than the last. Want to size the opportunity on your estate before the audit begins? Run the numbers in our LED lighting savings calculator — annual kWh, cost and CO₂e avoided in about a minute.
Four integrated layers
How LightLoop sits across your estate.
The foundation
The Lighting Decision Audit
A portfolio decision audit before any spend is committed — we'll scope it with you: asset baseline, treatment matrix, carbon baseline (TM65.2 method), an avoidable-replacement map, and a defensible evidence pack.
Embedded rules
LightLoop Management
Audit rules embedded into day-to-day maintenance. Fittings are tagged and recorded so any contractor sees history, approved treatment, compatible parts and warranty before a replacement is ordered. Decisions made before money is spent.
Delivery
LightLoop Projects
When the system confirms the route, EGG Lighting delivers. We assess whether remanufacture is the right answer, and where it is, we can undertake the work. EGG Lighting has remanufactured fittings at scale — 2,116 at a 150,000 sq ft headquarters in Aberdeen. What a specific programme needs is settled job by job: tell us what you have, and we will tell you what we can do with it.
Annual review
LightLoop Assurance
An annual review confirms compliance status, refreshes the treatment matrix and updates carbon reporting — a live evidence pack for ESG disclosures and procurement audits, year on year.
Live, contracted service
Emergency-lighting compliance, run for you — against the duty you already carry.
The legal duty to keep emergency lighting tested and evidenced comes from fire safety law — in Scotland, the Fire (Scotland) Act 2005, which places it on the duty holder. BS 5266-1:2025 is the code of practice. Manual testing is costly, error-prone and hard to evidence when it matters.
EGG Lighting runs that obligation as a managed service on a fixed annual retainer: we run the testing regime, hold the records, issue the certification, and flag failures — so your compliance evidence exists continuously, ready to file, rather than being reassembled under pressure at audit time.
The service leads on the obligation, not the technology.
Start the conversation
Start with a conversation.
No commitment to start the conversation. No sales pressure. A straight answer about what your estate is worth.
