Aberdeen energy provider headquarters

Flagship case study · Aberdeen

Sustainable Lighting Upgrade for a Major Energy Provider HQ

2,116 fittings remanufactured across 150,000 sq ft, completed November 2025 — a phased 52-week programme at about 50 fittings a week, remanufacturing rather than replacing.

2,116

fittings remanufactured

44%

lower installed lighting load

149 tCO₂e

embodied carbon avoided (estimated)

300 tCO₂e

operational carbon avoided over seven years (modelled)

£207,423

saving over seven years (modelled)

Project overview

A 150,000 sq ft HQ, upgraded without replacement.

A major multinational energy provider partnered with EGG Lighting to modernise the lighting across its 150,000 sq ft Aberdeen headquarters.

Instead of replacing more than 2,000 existing luminaires, EGG Lighting remanufactured and upgraded the original fittings using high-efficiency LED technology, advanced DALI-2 controls, automated emergency lighting testing, and intelligent monitoring systems. Digital Product Passports were issued for all 2,116 fittings.

The project demonstrates how organisations can dramatically reduce energy consumption, lower carbon emissions, and extend asset lifespan whilst supporting circular economy principles.

Key results

Outcomes across energy, cost, carbon and workplace.

Installed lighting load

44%

Lower installed lighting load (134,688 W to 75,484 W).

Embodied carbon

149 tCO₂e

Embodied carbon avoided (estimated, CIBSE TM65).

Operational carbon

300 tCO₂e

Operational carbon avoided over seven years (modelled).

Saving

£207,423

Saving over seven years (modelled).

Payback

About five years

About five-year payback (modelled).

Light levels

50–87%

Higher light levels across measured areas.

Why this project matters

Beyond energy savings.

Most lighting upgrades focus solely on reducing electricity consumption. This project demonstrates the wider benefits of remanufacturing:

Want a first-pass number for your own estate? Try the Energy Savings Calculator for annual saving, payback and CO₂e avoided.

  • Lower embodied carbon than full replacement
  • Reuse of existing lighting assets
  • Future-proof DALI-2 infrastructure
  • Automated emergency lighting compliance reporting
  • Intelligent monitoring and diagnostics
  • Replaceable LED modules and drivers
  • Reduced waste and circular economy benefits

Featured insight

The same housing. Entirely new technology.

Rather than sending 2,116 luminaires to landfill and purchasing new replacements, EGG Lighting retained the original housings and transformed them with new LED modules, Tridonic DALI-2 drivers, advanced optics, Bluetooth connectivity, and automated emergency monitoring.

The housing didn't change. Everything inside it did.

Full report

Download the full case study.

Explore the complete technical and financial analysis behind this remanufacturing project.

  • ✓Real-world monitored energy data
  • ✓Detailed ROI calculations
  • ✓Carbon assessment using CIBSE TM65 methodology
  • ✓Before-and-after lux measurements
  • ✓Remanufacturing process walkthrough
  • ✓Technical product comparisons
  • ✓Compliance and sustainability reporting

See how remanufacturing delivered measurable environmental, operational, and financial benefits at one of Scotland's major energy headquarters.

Aberdeen case study cover
Case study
Aberdeen HQ · 2025

Start the conversation

Start with a conversation.

No commitment to start the conversation. No sales pressure. A straight answer about what your estate is worth.